Port Services
We offer services of materials loading and unloading,
as well as the ascent and descent of the platform staff, maximizing
our conveniently located access to the Gulf of Mexico.
Infrastructure
- West dock: 429′ of waterfront with 1 acre of total
operation area - East dock: 479′ of waterfront with 1/2 acre of total
operation area - Draft at docks: 18′
- Water storage capacity: 360 tons
- Potable water supply
- Chemical products storage
- General warehouse
- Roof workshops
Equipment
- Cranes of 230, 100, 30 and 20 tons load capacity
- Front handler of 15 tons load capacity
- Telescopic lift
- Tract truck, flatbed for 30 tons and 30 tons lowboy